Lucerne
Upgrading the Hotel Palace
Description:
Total renovation of the Hotel Palace.
Client:
First Swiss Hotel Collection AG, Lucerne
Our job:
Planning the entire building technology, heating/ventilation/sanitary/air conditioning and technical coordination with BIM.
Special features:
Building to be cutting edge in terms of technology. Heating using reversible seawater heat pumps. Peak load to be covered using gas. The building model was made using a building scan so that technical coordination could be carried out using BIM.